In March 2011, Swedish telecom major TeliaSonera Eurasia signed an agreement with the GSMA for a Feasibility Study to be conducted by the GPM team. The study encompassed technical and financial feasibility analyses on a large number of base stations in TeliaSonera’s existing and planned networks in Azerbaijan, and identified those that are most suitable for green power solutions.