Banglalink – Bangladesh – Feasibility Study

Banglalink – Bangladesh – Feasibility Study image

The GSMA’s Green Power for Mobile (GPM) programme worked with Banglalink to analyse the entire Banglalink network, which consists of 4760 base stations, to identify specific solutions for energy cost savings.

Download here

Contact the GSMA

Please get in touch if you need more information or have any queries about anything you see on our website.

Contact us