The GSMA Green Power for Mobile (GPM) programme was commissioned by Zantel, Tanzania during Q3 2009 to complete a Feasibility Study to analyse the operator’s network and propose an implementation plan for a green power network.
The GSMA Green Power for Mobile (GPM) programme was commissioned by Zantel, Tanzania during Q3 2009 to complete a Feasibility Study to analyse the operator’s network and propose an implementation plan for a green power network.