COSMOTE TELEKOM has installed a private 5G standalone network at Aretaieio University Hospital in Athens, built exclusively for the needs of the operating theatres, the education centre and the radiology and radiotherapy departments. Doctors, nurses and trainees connect to it through AR and VR headsets and smart devices. The network and its supporting platform are in place; the applications that will use them are still to come. [1]
At a glance
| Location | Athens, Greece |
| Health system | Aretaieio University Hospital, National and Kapodistrian University of Athens |
| Consortium | WINGS ICT Solutions (coordinator and applications provider), COSMOTE TELEKOM (technical lead and connectivity), apoQlar, National and Kapodistrian University of Athens. The Phaistos Fund also participates |
| Connectivity | Independent private 5G standalone network installed by COSMOTE TELEKOM, with high-speed infrastructure for reaching cloud virtual reality applications and a platform for supervising them |
| Funding | CEF Digital, 5G and Edge Cloud for Smart Communities. HaDEA gives estimated project costs of €2,363,000 with an EU contribution of €1,772,000, covering the whole project rather than the network alone [2] |
| Status | Network installed, applications to follow |
| Year | Completion expected November 2027 |
How is connectivity being used?
COSMOTE TELEKOM has installed an independent private 5G standalone network for the needs of the operating theatres, the education centre and the radiology and radiotherapy departments, along with the high-speed infrastructure needed to reach cloud-based virtual reality applications and a platform for supervising them. Doctors, nurses and trainees are connected to it through AR and VR headsets and through smart devices carrying specially configured SIM cards. [1]
The project name says what it is for: surgical planning with holograms and educational streaming. According to COSMOTE’s announcement, doctors will be able to plan operations from three-dimensional images, train remotely and deliver care to distant areas by telemedicine, with AR and VR giving a fuller picture of a case before a complex procedure. These are described in the future tense throughout; none of them is running yet. [1]
There is a second strand that has little to do with surgery. The same project is building an environmental management layer covering air and water quality and electricity consumption, through which the hospital’s operations managers will be able to manage the building’s environmental footprint and use AI tools to work towards optimising it. WINGS is named as the provider of the project’s health and environmental applications. [1]
5G-SHEAL is funded under the same CEF Digital topic as healthcare 5G projects in Finland, Sweden, Belgium, France and Luxembourg. [2]
What has been the impact so far?
The result so far is the infrastructure. The network is installed, the connection to cloud applications is built, and access is restricted to authorised users and devices. The clinical and environmental applications follow, with the project expected to complete in November 2027. [1]
For now the measure of progress is that a hospital running live theatres has a private standalone network built for them.
Disclaimer: This page is based on publicly available information and has not been reviewed by the organisations named in it. Details were accurate at the time of writing and deployments may since have changed. If you were involved in this work and would like to correct or update anything here, please contact us at connectedhealth@gsma.com.
Contributing operators
Sources
[1] COSMOTE TELEKOM announcement, 6 July 2026. Greek original carried by iatronet.gr: https://www.iatronet.gr/article/141404/idiotiko-diktyo-5g-sa-sto-aretaieio-nosokomeio-apo-thn-cosmote-telekom — English translation carried by Euro2day: https://www.euro2day.gr/en/article/2359121/private-5g-sa-network-at-aretaieio-hospital-by-cos
[2] HaDEA, CEF Digital, 5G and Edge Cloud for Smart Communities, awarded projects. https://hadea.ec.europa.eu/programmes/connecting-europe-facility/about/cef-digital-5g-and-edge-cloud-smart-communities_en