Resources

Filter

SGP.16 v1.3

Working Group Resources

Thursday 25 Mar 2021 |

To notify Software changes on eUICC certified products there is a GSMA internal Operational procedure called EUM Self-assessment of eUICC Certified products updates. You can request this document by sending an email to ...

SGP.08 v1.0

Working Group Resources

Thursday 25 Mar 2021 |

This document covers the security certification framework for the Integrated eUICC and the process that SHALL be followed to perform the security evaluation of the Integrated eUICC that have been designed referencing GSMA PRD SGP.01. ...

GSMA eUICC PKI Certificate Policy v2.1

Working Group Resources

Thursday 11 Feb 2021 |

This document defines the policies by which the eUICC PKI will be governed by the eUICC PKI Policy Authority

SGP.23 v1.9 eSIM Test Specification

Working Group Resources

Thursday 11 Feb 2021 |

This Test Plan provides a set of test cases to be used for testing the implementations of the provisioning system specifications documents (SGP.22/21). This document offers to the involved entities an unified test strategy and ensures ...

GSMA eUICC Security Assurance Scheme Step-by-Step Guide

Working Group Resources

Friday 5 Feb 2021 |

The following eUICC Security Assurance Step-by-step guide provides an overview of the steps to be followed to apply for the GSMA eSA scheme as well as the list of GSMA eSA Licensed Laboratories and GSMA Certification Body. Please ...

SGP.16 v1.2 M2M Compliance Process

Working Group Resources

Monday 16 Nov 2020 |

SGP.11 eSIM Test Specification

Working Group Resources

Thursday 22 Oct 2020 |

These test specifications are to be used by test labs to develop test for the principal components and interfaces of the GSMA’s Remote Provisioning Architecture for Embedded UICC.

SGP.24 Compliance Process

Working Group Resources

Thursday 22 Oct 2020 |

This document provides a description of the process and procedures that MUST be followed to declare a product, platform or service to be compliant with the GSMA requirements and technical specifications defined in SGP.21 and SGP.22.

SGP.23 v1.8 eSIM Test Specification

Working Group Resources

Thursday 22 Oct 2020 |

This Test Plan provides a set of test cases to be used for testing the implementations of the provisioning system specifications documents (SGP.22/21 v2.1/v2.2). This document offers to the involved entities an unified test strategy ...

SGP.24 Compliance Process

Working Group Resources

Tuesday 7 Jul 2020 |

This document provides a description of the process and procedures that MUST be followed to declare a product, platform or service to be compliant with the GSMA requirements and technical specifications defined in SGP.21 [1] and SGP.22 [2].

SGP.26 v1.4 RSP Test Certificates defintions

Working Group Resources

Friday 31 Jul 2020 |

These test specifications are to be used by test labs to develop test for the principal components and interfaces of the GSMA’s Remote Provisioning Architecture for Embedded UICC.

SGP.29 v1.0 EID Definition and Assignment Process

Working Group Resources

Friday 31 Jul 2020 |

This document specifies: 1. the EID principles and requirements to be followed by the entities that assign EID numbers; 2. the format of the EID; and, 3. the EID assignment process to be followed by assignment authorities. When ...

SGP.11 v4.2

Working Group Resources

Friday 31 Jul 2020 |

These test specifications are to be used by test labs to develop test for the principal components and interfaces of the GSMA’s Remote Provisioning Architecture for Embedded UICC.

SGP.02 v4.2

Working Group Resources

Tuesday 7 Jul 2020 |

This document provides a technical description of the GSMA’s ‘Remote Provisioning Architecture for Embedded UICC’.

SGP.01 v4.2

Working Group Resources

Tuesday 7 Jul 2020 |

The aim of this document is to define a common architecture framework to enable the remote Provisioning and management of the Embedded UICC (eUICC) in Devices which are not easily reachable, and additionally a way to locally switch ...

SGP.06 v1.0

Working Group Resources

Tuesday 7 Jul 2020 |

This document provides the GSMA eUICC Security Assurance Principles for the GSMA eUICC Scheme including key details, contacts, and links. This document has been designed referencing GSMA PRDs SGP.01 (M2M) and SGP.21 (Consumer). The ...

SGP.07 v1.0

Working Group Resources

Tuesday 7 Jul 2020 |

Invitation to Tender

SGP.23 v1.7

Working Group Resources

Tuesday 7 Jul 2020 |

This Test Plan provides a set of test cases to be used for testing the implementations of the provisioning system specifications documents (SGP.22/21 v2.1/v2.2). This document offers to the involved entities an unified test strategy ...

SGP.26 v1.3

Working Group Resources

Tuesday 7 Jul 2020 |

This document’s scope is to define the Test Certificates that will be used in the tests specified in SGP.23 v1.2 based on SGP.22 v2.1 and v2.2. These Test Certificates are based on NIST P-256 and Brainpool P256r1 curves and target the nominal test cases fo

SGP.11 v4.1

Working Group Resources

Tuesday 7 Jul 2020 |

These test specifications are to be used by test labs to develop test for the principal components and interfaces of the GSMA’s Remote Provisioning Architecture for Embedded UICC.