In March 2011, Swedish telecom major TeliaSonera Eurasia signed an agreement with the GSMA for a Feasibility Study to be conducted by the Green Power for Mobile (GPM) team. The study encompassed technical and financial feasibility analyses on a large number of base stations in TeliaSonera’s existing and planned networks in Nepal, Tajikistan and Azerbaijan, and identified those that are most suitable for green power solutions.